Redwood Engineering Construction is bidding as a prime contractor on the City of Sunnyvale Playground Equipment Replacement 2022 Project, bidding on 9/21/2022 at 3pm. We are requesting bid proposals from all subcontractors and suppliers. Please email
Bidders will be required to sign REC’s standard subcontract. You may be required to provide a 100% payment and performance bond. Assistance can be provided to DBE/SBE firms upon request.
Complete plans and specifications can be downloaded at https://www.demandstar.com/app/limited/bids/403050/details
- Engineer’s Estimate: none
- Contract Duration: 250 working days
- $1000 per calendar day liquidated damages
- Potential subcontractor and supplier scopes of work include, but are not limited to,
- Trucking and soil disposal
- SWPPP
- Survey and construction staking
- Structural design for playground equipment footings
- Geotechnical engineering / compaction testing
- Signage
- Furnish play equipment
- Install play equipment
- Site furnishings
- PIP rubber surfacing
- Engineered wood fiber
- Furnish decomposed granite, class 2 aggregate base rock, trench bedding, etc
- Fence
- CPSI safety audit and surface impact testing
- Boulders
- Concrete flatwork
Redwood Engineering Construction is bidding as a prime contractor on the SJC Economy Lot 1 Bioretention Cell Project in the City of San Jose on August 1, 2022. We invite all subcontractors and suppliers, especially any LBE, DBE, WBE, DVBE, or SBE firms to submit quotes. Complete plans and specs can be downloaded from the city’s website at https://www.biddingo.com/sanjose. Please contact us to indicate your interest or if you have any questions or need assistance. Quotes can be sent to
This project involves the construction of a new 2,640 square foot bioretention cell to treat stormwater runoff from a drainage area of approximately 1.44 acres within the Airport’s Economy Parking Lot 1. This project will serve as alternative Municipal Regional Permit Provision C.3 compliance to treat stormwater runoff generated by the Airport’s Interim Facility construction.
- Engineer’s Estimate: $313,125.00
- Contract Duration: 270 calendar days (90 CDs for construction, 180 CDs for maintenance)
- $1000 per calendar day liquidated damages
- Potential subcontractor and supplier scopes of work include,
- Trucking and soil disposal
- Water pollution control plan
- Signage
- Pavement markings
- Survey
Item No. | Spec Section | ITEM DESCRIPTION | QUANTITY | UNIT |
1 | 4-3.01 | Removal and Disposal of Hazardous Waste Material at a Class I off-site Facility (Revocable) | 1.0 | FA |
2 | 5-2 | Red Line Documents | 1.0 | LS |
3 | 11-1 | Mobilization | 1.0 | LS |
4 | 13-4 | Implement WPCP | 1.0 | LS |
5 | 15-3.01 | Minor Design Revisions for Utility Conflicts (Revocable) | 1.0 | FA |
6 | 15-6 | Demolish Miscellaneous Items | 1.0 | LS |
7 | 19-2 | Roadway Excavation | 310.0 | CY |
8 | 20-2 | Landscaping | 1.0 | LS |
9 | 20-3 | Establishment Period | 1.0 | LS |
10 | 47-1 | Bioretention Walls | 175.0 | LF |
11 | 82-1 | Signage | 2.0 | EA |
12 | 83-1 | Permanent Bollard | 24.0 | EA |
13 | 83-1 | Curb Stop | 14.0 | EA |
14 | 84-2 | Pavement Markings | 1.0 | LS |
15 | 1310-3 | Bioretention System | 1.0 | LS |
Redwood Engineering Construction is bidding as a prime contractor on the Regnart Creek Trail Project in the City of Cupertino on January 8, 2021. We invite all subcontractors and suppliers, especially any DBE, WBE, DVBE, or SBE firms to submit quotes by 1/7/21. Complete plans and specs can be downloaded from the city’s website at https://apps.cupertino.org/bidmanagement/Details.aspx. Please contact us to indicate your interest or if you have any questions or need assistance. Quotes can be sent to
Project Number |
2020-13 |
Project Name |
Regnart Creek Trail Project |
Project Type |
Project Bids |
Status |
Active |
Date Issued |
12/11/2020 2:50:00 PM |
Date Due |
1/8/2021 2:00:00 PM |
Engineer's Estimate |
$1,650,000.00 |
Scope of Work |
Construction of a multi-use trail adjacent to Regnart Creek from Pacifica Drive to East Estate Drive. |
Potential subcontractor and supplier scopes of work include, but are not limited to:
- Fence and gates
- Survey and construction staking
- Trucking
- Soil off-haul and disposal
- Aggregate import (base rock, decomposed granite, etc)
- Prefabricated bridge
- Concrete flatwork
- Asphald grinding & paving
- Supply of drain inlets
- Hydroseed
- Electrical
- Tree removal
ITEM NO. |
ITEM DESCRIPTION |
QUANTITY |
UNIT |
1 |
Mobilization |
1.0 |
LS |
2 |
Field Engineering and Survey Work |
1.0 |
LS |
3 |
Traffic Control and Construction Area Signs |
1.0 |
LS |
4 |
Tree Protection |
1.0 |
LS |
5 |
Utility Location |
1.0 |
LS |
6 |
Remove Tree |
3.0 |
EA |
7 |
Remove PCC Concrete |
1,700.0 |
SF |
8 |
Remove Curb & Gutter |
165.0 |
LF |
9 |
Remove Fence and Gates |
475.0 |
LF |
10 |
Adjust Manhole Frame and Cover to Grade |
1.0 |
EA |
11 |
Site Clearing |
1.0 |
LS |
12 |
Earthwork (Final Pay Item) |
1,583.0 |
CY |
13 |
Class 2 Aggregate Base |
612.0 |
CY |
14 |
Grind Asphalt Concrete Pavement |
1,010.0 |
SF |
15 |
HMA (Type A) |
73.0 |
TON |
16 |
Construct Sidewalk |
3,255.0 |
SF |
17 |
Construct Type A2-6 Curb & Gutter |
175.0 |
LF |
18 |
Construct Curb Ramp |
4.0 |
EA |
19 |
Decomposed Granite |
395.0 |
CY |
20 |
12" Reinforced Concrete Pipe |
60.0 |
LF |
21 |
Hooded Curb Inlet |
2.0 |
EA |
22 |
24" X 24" Inlet |
6.0 |
EA |
23 |
Chain Link Fence |
260.0 |
LF |
24 |
Chain Link Gate |
4.0 |
EA |
25 |
Removable Split Railing |
2,200.0 |
LF |
26 |
Relocate Scoreboard |
1.0 |
LS |
27 |
Restore Irrigation and Planting Systems |
1.0 |
LS |
28 |
Drop Rod |
17.0 |
EA |
29 |
Bender Board |
8,200.0 |
LF |
30 |
Adjust Existing Utility Boxes to Grade |
6.0 |
EA |
31 |
Hydroseed |
######## |
SF |
32 |
Temporary Fiber Roll |
8,400.0 |
LF |
33 |
Temporary Inlet Protection |
7.0 |
EA |
34 |
Temporary Concrete Washout |
1.0 |
EA |
35 |
Temporary Construction Entrance |
5.0 |
EA |
36 |
Street Sweeping |
1.0 |
LS |
37 |
Storm Water Pollution Prevention Plan Implementation |
1.0 |
LS |
38 |
Removable Bollard |
10.0 |
EA |
39 |
Iron Pipe Boundary Marker |
2.0 |
EA |
40 |
Biaxial Geogrid |
100.0 |
SY |
41 |
Obliterate Concrete |
730.0 |
SF |
42 |
Concrete Slope Paving |
100.0 |
CY |
43 |
Concrete Grid Pavement |
1,700.0 |
SF |
44 |
Sand |
8.0 |
CY |
45 |
Aggregate Base Concrete Grid Pavement |
70.0 |
CY |
46 |
Install Decorative Steel Fence |
430.0 |
LF |
47 |
Remove Fence |
165.0 |
LF |
48 |
Cap and Abandon Irrigation System |
2.0 |
EA |
49 |
Concrete Masonry Unit Wall |
20.0 |
LF |
50 |
Decorative Steel Gate |
4.0 |
EA |
51 |
Decorative Steel Gate (Automatic Vehicular) |
1.0 |
EA |
52 |
Caltrans Modified Type D4 Curb |
140.0 |
LF |
53 |
Parcel Locker |
1.0 |
EA |
54 |
Channelizers |
10.0 |
EA |
55 |
Plant Tree |
2.0 |
EA |
56 |
Structure Excavation (Bridge) (Final Pay Item) |
41.0 |
CY |
57 |
Structure Backfill (Bridge) (Final Pay Item) |
29.0 |
CY |
58 |
30" Cast-In-Drilled-Hole Concrete Piling |
110.0 |
LF |
59 |
Structural Concrete, Bridge (Final Pay Item) |
28.0 |
CY |
60 |
Prefabricated Steel Pedestrian Bridge 1 |
1.0 |
LS |
61 |
Prefabricated Steel Pedestrian Bridge Erection |
1.0 |
LS |
62 |
Bar Reinforcing Steel (Bridge) (Final Pay Item) |
5,319.0 |
LB |
63 |
Miscellaneous Metal (Bridge) (Final Pay Item) |
71.0 |
LB |
Redwood Engineering Construction is bidding on the McCandless Park Project in Milpitas, California as a prime contractor and invites certified SBEs, DBEs and others to submit a subcontractor quote. The project bids on 11/19/2020. Please direct proposals to
Potential subcontractor and vendor scopes include, but aren’t limited, to the following:
- Poured in Place Rubber Surfacing
- Playground Equipment Installer (Gametime certified)
- Certified Playground Safety Inspector
- Trucking
- Concrete
- Asphalt paving
- Supply of prefabricated buildings
- Fence
- Signage
- Electrical
- Parking Lot Striping and wheel stops
- Earthwork and Grading
- Underground Utilities (Water, Sewer, Storm Drain)
- Site Furnishings
- Irrigation
- Landscaping and planting
The engineer's estimate is $6.5M-$8M with a contract duration of 550 calendar days and $4,000 per day liquidated damages. Plans and specifications can be downloaded from www.printscharlesrepro.com or can be provided as a courtesy by emailing
Redwood Engineering & Construction will be bidding on the SF Golden Gate Heights Playground & Field Renovation Project in San Francisco as a prime contractor and invites certified LBEs and others to submit a subcontractor quote. The project bids on 03/04/2020. Please direct proposals to
Potential subcontractor scopes include, but aren’t limited, to the following:
- Survey
- Synthetic Turf
- Playground Equipment Installer
- Certified Playground Safety Inspector
- Trucking
- Concrete
- Metalwork / railing
The engineer's estimate is $1,286,000 with a contract duration of 245 calendar days and $2500 per day liquidated damages. Plans and specifications can be downloaded from San Francisco's website: