Redwood Engineering Construction is bidding as a prime contractor on the Regnart Creek Trail Project in the City of Cupertino on January 8, 2021. We invite all subcontractors and suppliers, especially any DBE, WBE, DVBE, or SBE firms to submit quotes by 1/7/21. Complete plans and specs can be downloaded from the city’s website at https://apps.cupertino.org/bidmanagement/Details.aspx. Please contact us to indicate your interest or if you have any questions or need assistance. Quotes can be sent to
Project Number |
2020-13 |
Project Name |
Regnart Creek Trail Project |
Project Type |
Project Bids |
Status |
Active |
Date Issued |
12/11/2020 2:50:00 PM |
Date Due |
1/8/2021 2:00:00 PM |
Engineer's Estimate |
$1,650,000.00 |
Scope of Work |
Construction of a multi-use trail adjacent to Regnart Creek from Pacifica Drive to East Estate Drive. |
Potential subcontractor and supplier scopes of work include, but are not limited to:
- Fence and gates
- Survey and construction staking
- Trucking
- Soil off-haul and disposal
- Aggregate import (base rock, decomposed granite, etc)
- Prefabricated bridge
- Concrete flatwork
- Asphald grinding & paving
- Supply of drain inlets
- Hydroseed
- Electrical
- Tree removal
ITEM NO. |
ITEM DESCRIPTION |
QUANTITY |
UNIT |
1 |
Mobilization |
1.0 |
LS |
2 |
Field Engineering and Survey Work |
1.0 |
LS |
3 |
Traffic Control and Construction Area Signs |
1.0 |
LS |
4 |
Tree Protection |
1.0 |
LS |
5 |
Utility Location |
1.0 |
LS |
6 |
Remove Tree |
3.0 |
EA |
7 |
Remove PCC Concrete |
1,700.0 |
SF |
8 |
Remove Curb & Gutter |
165.0 |
LF |
9 |
Remove Fence and Gates |
475.0 |
LF |
10 |
Adjust Manhole Frame and Cover to Grade |
1.0 |
EA |
11 |
Site Clearing |
1.0 |
LS |
12 |
Earthwork (Final Pay Item) |
1,583.0 |
CY |
13 |
Class 2 Aggregate Base |
612.0 |
CY |
14 |
Grind Asphalt Concrete Pavement |
1,010.0 |
SF |
15 |
HMA (Type A) |
73.0 |
TON |
16 |
Construct Sidewalk |
3,255.0 |
SF |
17 |
Construct Type A2-6 Curb & Gutter |
175.0 |
LF |
18 |
Construct Curb Ramp |
4.0 |
EA |
19 |
Decomposed Granite |
395.0 |
CY |
20 |
12" Reinforced Concrete Pipe |
60.0 |
LF |
21 |
Hooded Curb Inlet |
2.0 |
EA |
22 |
24" X 24" Inlet |
6.0 |
EA |
23 |
Chain Link Fence |
260.0 |
LF |
24 |
Chain Link Gate |
4.0 |
EA |
25 |
Removable Split Railing |
2,200.0 |
LF |
26 |
Relocate Scoreboard |
1.0 |
LS |
27 |
Restore Irrigation and Planting Systems |
1.0 |
LS |
28 |
Drop Rod |
17.0 |
EA |
29 |
Bender Board |
8,200.0 |
LF |
30 |
Adjust Existing Utility Boxes to Grade |
6.0 |
EA |
31 |
Hydroseed |
######## |
SF |
32 |
Temporary Fiber Roll |
8,400.0 |
LF |
33 |
Temporary Inlet Protection |
7.0 |
EA |
34 |
Temporary Concrete Washout |
1.0 |
EA |
35 |
Temporary Construction Entrance |
5.0 |
EA |
36 |
Street Sweeping |
1.0 |
LS |
37 |
Storm Water Pollution Prevention Plan Implementation |
1.0 |
LS |
38 |
Removable Bollard |
10.0 |
EA |
39 |
Iron Pipe Boundary Marker |
2.0 |
EA |
40 |
Biaxial Geogrid |
100.0 |
SY |
41 |
Obliterate Concrete |
730.0 |
SF |
42 |
Concrete Slope Paving |
100.0 |
CY |
43 |
Concrete Grid Pavement |
1,700.0 |
SF |
44 |
Sand |
8.0 |
CY |
45 |
Aggregate Base Concrete Grid Pavement |
70.0 |
CY |
46 |
Install Decorative Steel Fence |
430.0 |
LF |
47 |
Remove Fence |
165.0 |
LF |
48 |
Cap and Abandon Irrigation System |
2.0 |
EA |
49 |
Concrete Masonry Unit Wall |
20.0 |
LF |
50 |
Decorative Steel Gate |
4.0 |
EA |
51 |
Decorative Steel Gate (Automatic Vehicular) |
1.0 |
EA |
52 |
Caltrans Modified Type D4 Curb |
140.0 |
LF |
53 |
Parcel Locker |
1.0 |
EA |
54 |
Channelizers |
10.0 |
EA |
55 |
Plant Tree |
2.0 |
EA |
56 |
Structure Excavation (Bridge) (Final Pay Item) |
41.0 |
CY |
57 |
Structure Backfill (Bridge) (Final Pay Item) |
29.0 |
CY |
58 |
30" Cast-In-Drilled-Hole Concrete Piling |
110.0 |
LF |
59 |
Structural Concrete, Bridge (Final Pay Item) |
28.0 |
CY |
60 |
Prefabricated Steel Pedestrian Bridge 1 |
1.0 |
LS |
61 |
Prefabricated Steel Pedestrian Bridge Erection |
1.0 |
LS |
62 |
Bar Reinforcing Steel (Bridge) (Final Pay Item) |
5,319.0 |
LB |
63 |
Miscellaneous Metal (Bridge) (Final Pay Item) |
71.0 |
LB |

Redwood Engineering Construction is bidding on the McCandless Park Project in Milpitas, California as a prime contractor and invites certified SBEs, DBEs and others to submit a subcontractor quote. The project bids on 11/19/2020. Please direct proposals to
Potential subcontractor and vendor scopes include, but aren’t limited, to the following:
- Poured in Place Rubber Surfacing
- Playground Equipment Installer (Gametime certified)
- Certified Playground Safety Inspector
- Trucking
- Concrete
- Asphalt paving
- Supply of prefabricated buildings
- Fence
- Signage
- Electrical
- Parking Lot Striping and wheel stops
- Earthwork and Grading
- Underground Utilities (Water, Sewer, Storm Drain)
- Site Furnishings
- Irrigation
- Landscaping and planting
The engineer's estimate is $6.5M-$8M with a contract duration of 550 calendar days and $4,000 per day liquidated damages. Plans and specifications can be downloaded from www.printscharlesrepro.com or can be provided as a courtesy by emailing
Redwood Engineering & Construction will be bidding on the SF Golden Gate Heights Playground & Field Renovation Project in San Francisco as a prime contractor and invites certified LBEs and others to submit a subcontractor quote. The project bids on 03/04/2020. Please direct proposals to
Potential subcontractor scopes include, but aren’t limited, to the following:
- Survey
- Synthetic Turf
- Playground Equipment Installer
- Certified Playground Safety Inspector
- Trucking
- Concrete
- Metalwork / railing
The engineer's estimate is $1,286,000 with a contract duration of 245 calendar days and $2500 per day liquidated damages. Plans and specifications can be downloaded from San Francisco's website:

Redwood Engineering & Construction will be bidding on the Gardiner Park Renovation Project in South San Francisco as a prime contractor and invites you to submit a subcontractor quote. The project bids on 12/18/19. Please direct proposals to
Potential subcontractor scopes include, but aren’t limited, to the following:
- Survey
- Trucking
- Masonry columns for signage
- Metal sign fabrication & installation
- Metal handrail
- Paving
- Shotcrete
- Concrete flatwork
- Playground equipment installation
- Site furnishings (basketball hoop, drinking fountain, etc)
- Electrical and lighting
- Chain link fence
- Athletic court surfacing and striping (Nova Sports certified installer)
Bid documents, including addenda, can be downloaded from the ebidboard website:
Engineer's Estimate: |
$575,000 |
Contract Duration |
90 WDs |
Liquidated Damages |
$1000 per day |
Here is a list of bid items on the project:
Mobilization/Temp. Facilities |
1 |
LS |
Temporary Tree Protection |
1 |
LS |
Layout and Staking |
1 |
LS |
Trucking and Off-haul |
80 |
TON |
Demolition + Site Clearing |
1 |
LS |
Shotcrete |
325 |
SF |
Metal Railing and Handrail |
135 |
LF |
Anti-Graffiti Coating |
1 |
LS |
Install Play Equipment |
1 |
LS |
Install Site Furnishings |
1 |
LS |
Fabricate and Install Signage |
1 |
LS |
Install Drinking Fountain and Utility Connections |
1 |
LS |
Install Electrical Fixtures |
1 |
LS |
Earthwork and Grading |
1 |
LS |
Erosion Control |
1 |
LS |
Aggregate Base at Playground |
1 |
LS |
Asphalt Paving SF |
1775 |
SF |
Concrete Paving |
500 |
SF |
Unit Paving |
850 |
SF |
Coordinate Playground Protective Surfacing |
1 |
LS |
Athletic Court Surfacing |
1 |
LS |
Chain Link Fencing |
250 |
LF |
Concrete Entry Wall |
1 |
LS |
Concrete Perimeter Wall |
66 |
LF |
Concrete Planter Wall |
58 |
LF |
Curb Divide |
35 |
LF |
Court Planter Wall |
90 |
LF |
Irrigation work |
1 |
LS |
Planting |
1 |
LS |
Storm Drain Facilities |
1 |
LS |