Redwood Engineering Construction is bidding as a prime contractor on the SJC Economy Lot 1 Bioretention Cell Project in the City of San Jose on August 1, 2022. We invite all subcontractors and suppliers, especially any LBE, DBE, WBE, DVBE, or SBE firms to submit quotes. Complete plans and specs can be downloaded from the city’s website at https://www.biddingo.com/sanjose. Please contact us to indicate your interest or if you have any questions or need assistance. Quotes can be sent to
This project involves the construction of a new 2,640 square foot bioretention cell to treat stormwater runoff from a drainage area of approximately 1.44 acres within the Airport’s Economy Parking Lot 1. This project will serve as alternative Municipal Regional Permit Provision C.3 compliance to treat stormwater runoff generated by the Airport’s Interim Facility construction.
- Engineer’s Estimate: $313,125.00
- Contract Duration: 270 calendar days (90 CDs for construction, 180 CDs for maintenance)
- $1000 per calendar day liquidated damages
- Potential subcontractor and supplier scopes of work include,
- Trucking and soil disposal
- Water pollution control plan
- Signage
- Pavement markings
- Survey
Item No. | Spec Section | ITEM DESCRIPTION | QUANTITY | UNIT |
1 | 4-3.01 | Removal and Disposal of Hazardous Waste Material at a Class I off-site Facility (Revocable) | 1.0 | FA |
2 | 5-2 | Red Line Documents | 1.0 | LS |
3 | 11-1 | Mobilization | 1.0 | LS |
4 | 13-4 | Implement WPCP | 1.0 | LS |
5 | 15-3.01 | Minor Design Revisions for Utility Conflicts (Revocable) | 1.0 | FA |
6 | 15-6 | Demolish Miscellaneous Items | 1.0 | LS |
7 | 19-2 | Roadway Excavation | 310.0 | CY |
8 | 20-2 | Landscaping | 1.0 | LS |
9 | 20-3 | Establishment Period | 1.0 | LS |
10 | 47-1 | Bioretention Walls | 175.0 | LF |
11 | 82-1 | Signage | 2.0 | EA |
12 | 83-1 | Permanent Bollard | 24.0 | EA |
13 | 83-1 | Curb Stop | 14.0 | EA |
14 | 84-2 | Pavement Markings | 1.0 | LS |
15 | 1310-3 | Bioretention System | 1.0 | LS |