Potential subcontractor scopes include, but aren’t limited, to the following:
- Survey
- Trucking
- Masonry columns for signage
- Metal sign fabrication & installation
- Metal handrail
- Paving
- Shotcrete
- Concrete flatwork
- Playground equipment installation
- Site furnishings (basketball hoop, drinking fountain, etc)
- Electrical and lighting
- Chain link fence
- Athletic court surfacing and striping (Nova Sports certified installer)
Bid documents, including addenda, can be downloaded from the ebidboard website:
Engineer's Estimate: |
$575,000 |
Contract Duration |
90 WDs |
Liquidated Damages |
$1000 per day |
Here is a list of bid items on the project:
Mobilization/Temp. Facilities |
1 |
LS |
Temporary Tree Protection |
1 |
LS |
Layout and Staking |
1 |
LS |
Trucking and Off-haul |
80 |
TON |
Demolition + Site Clearing |
1 |
LS |
Shotcrete |
325 |
SF |
Metal Railing and Handrail |
135 |
LF |
Anti-Graffiti Coating |
1 |
LS |
Install Play Equipment |
1 |
LS |
Install Site Furnishings |
1 |
LS |
Fabricate and Install Signage |
1 |
LS |
Install Drinking Fountain and Utility Connections |
1 |
LS |
Install Electrical Fixtures |
1 |
LS |
Earthwork and Grading |
1 |
LS |
Erosion Control |
1 |
LS |
Aggregate Base at Playground |
1 |
LS |
Asphalt Paving SF |
1775 |
SF |
Concrete Paving |
500 |
SF |
Unit Paving |
850 |
SF |
Coordinate Playground Protective Surfacing |
1 |
LS |
Athletic Court Surfacing |
1 |
LS |
Chain Link Fencing |
250 |
LF |
Concrete Entry Wall |
1 |
LS |
Concrete Perimeter Wall |
66 |
LF |
Concrete Planter Wall |
58 |
LF |
Curb Divide |
35 |
LF |
Court Planter Wall |
90 |
LF |
Irrigation work |
1 |
LS |
Planting |
1 |
LS |
Storm Drain Facilities |
1 |
LS |