Future Regnart Creek Trail in Cupertino, CA

Redwood Engineering Construction is bidding as a prime contractor on the Regnart Creek Trail Project in the City of Cupertino on January 8, 2021.  We invite all subcontractors and suppliers, especially any DBE, WBE, DVBE, or SBE firms to submit quotes by 1/7/21.  Complete plans and specs can be downloaded from the city’s website at https://apps.cupertino.org/bidmanagement/Details.aspx.  Please contact us to indicate your interest or if you have any questions or need assistance.  Quotes can be sent to This email address is being protected from spambots. You need JavaScript enabled to view it. or faxed to 415-329-3240

Project Number

2020-13

Project Name

Regnart Creek Trail Project

Project Type

Project Bids

Status

Active

Date Issued

12/11/2020 2:50:00 PM

Date Due

1/8/2021 2:00:00 PM

Engineer's Estimate

$1,650,000.00

Scope of Work

Construction of a multi-use trail adjacent to Regnart Creek from Pacifica Drive to East Estate Drive.

Potential subcontractor and supplier scopes of work include, but are not limited to:

  • Fence and gates
  • Survey and construction staking
  • Trucking
  • Soil off-haul and disposal
  • Aggregate import (base rock, decomposed granite, etc)
  • Prefabricated bridge
  • Concrete flatwork
  • Asphald grinding & paving
  • Supply of drain inlets
  • Hydroseed
  • Electrical
  • Tree removal 

ITEM NO.

ITEM DESCRIPTION

QUANTITY

UNIT

1

Mobilization

         1.0

LS

2

Field Engineering and Survey Work

         1.0

LS

3

Traffic Control and Construction Area Signs

         1.0

LS

4

Tree Protection

         1.0

LS

5

Utility Location

         1.0

LS

6

Remove Tree

         3.0

EA

7

Remove PCC Concrete

1,700.0

SF

8

Remove Curb & Gutter

     165.0

LF

9

Remove Fence and Gates

     475.0

LF

10

Adjust Manhole Frame and Cover to Grade

         1.0

EA

11

Site Clearing

         1.0

LS

12

Earthwork (Final Pay Item)

1,583.0

CY

13

Class 2 Aggregate Base

     612.0

CY

14

Grind Asphalt Concrete Pavement

1,010.0

SF

15

HMA (Type A)

       73.0

TON

16

Construct Sidewalk

3,255.0

SF

17

Construct Type A2-6 Curb & Gutter

     175.0

LF

18

Construct Curb Ramp

         4.0

EA

19

Decomposed Granite

     395.0

CY

20

12" Reinforced Concrete Pipe

       60.0

LF

21

Hooded Curb Inlet

         2.0

EA

22

24" X 24" Inlet

         6.0

EA

23

Chain Link Fence

     260.0

LF

24

Chain Link Gate

         4.0

EA

25

Removable Split Railing

2,200.0

LF

26

Relocate Scoreboard

         1.0

LS

27

Restore Irrigation and Planting Systems

         1.0

LS

28

Drop Rod

       17.0

EA

29

Bender Board

8,200.0

LF

30

Adjust Existing Utility Boxes to Grade

         6.0

EA

31

Hydroseed

########

SF

32

Temporary Fiber Roll

8,400.0

LF

33

Temporary Inlet Protection

         7.0

EA

34

Temporary Concrete Washout

         1.0

EA

35

Temporary Construction Entrance

         5.0

EA

36

Street Sweeping

         1.0

LS

37

Storm Water Pollution Prevention Plan Implementation

         1.0

LS

38

Removable Bollard

       10.0

EA

39

Iron Pipe Boundary Marker

         2.0

EA

40

Biaxial Geogrid

     100.0

SY

41

Obliterate Concrete

     730.0

SF

42

Concrete Slope Paving

     100.0

CY

43

Concrete Grid Pavement

1,700.0

SF

44

Sand

         8.0

CY

45

Aggregate Base Concrete Grid Pavement

       70.0

CY

46

Install Decorative Steel Fence

     430.0

LF

47

Remove Fence

     165.0

LF

48

Cap and Abandon Irrigation System

         2.0

EA

49

Concrete Masonry Unit Wall

       20.0

LF

50

Decorative Steel Gate

         4.0

EA

51

Decorative Steel Gate (Automatic Vehicular)

         1.0

EA

52

Caltrans Modified Type D4 Curb

     140.0

LF

53

Parcel Locker

         1.0

EA

54

Channelizers

       10.0

EA

55

Plant Tree

         2.0

EA

56

Structure Excavation (Bridge) (Final Pay Item)

       41.0

CY

57

Structure Backfill (Bridge) (Final Pay Item)

       29.0

CY

58

30" Cast-In-Drilled-Hole Concrete Piling

     110.0

LF

59

Structural Concrete, Bridge (Final Pay Item)

       28.0

CY

60

Prefabricated Steel Pedestrian Bridge 1

         1.0

LS

61

Prefabricated Steel Pedestrian Bridge Erection

         1.0

LS

62

Bar Reinforcing Steel (Bridge) (Final Pay Item)

5,319.0

LB

63

Miscellaneous Metal (Bridge) (Final Pay Item)

       71.0

LB 

 

Tags:
Site of future McCandless Park in Milpitas, California

Redwood Engineering Construction is bidding on the McCandless Park Project in Milpitas, California as a prime contractor and invites certified SBEs, DBEs and others to submit a subcontractor quote.  The project bids on 11/19/2020.  Please direct proposals to This email address is being protected from spambots. You need JavaScript enabled to view it..

Potential subcontractor and vendor scopes include, but aren’t limited, to the following:

  • Poured in Place Rubber Surfacing
  • Playground Equipment Installer (Gametime certified)
  • Certified Playground Safety Inspector
  • Trucking
  • Concrete
  • Asphalt paving
  • Supply of prefabricated buildings
  • Fence
  • Signage
  • Electrical
  • Parking Lot Striping and wheel stops
  • Earthwork and Grading
  • Underground Utilities (Water, Sewer, Storm Drain)
  • Site Furnishings
  • Irrigation
  • Landscaping and planting

The engineer's estimate is $6.5M-$8M with a contract duration of 550 calendar days and $4,000 per day liquidated damages.  Plans and specifications can be downloaded from www.printscharlesrepro.com or can be provided as a courtesy by emailing This email address is being protected from spambots. You need JavaScript enabled to view it..

Tags:

Redwood Engineering & Construction will be bidding on the Gardiner Park Renovation Project in South San Francisco as a prime contractor and invites you to submit a subcontractor quote.  The project bids on 12/18/19.  Please direct proposals to This email address is being protected from spambots. You need JavaScript enabled to view it..

Potential subcontractor scopes include, but aren’t limited, to the following:

  • Survey
  • Trucking
  • Masonry columns for signage
  • Metal sign fabrication & installation
  • Metal handrail
  • Paving
  • Shotcrete
  • Concrete flatwork
  • Playground equipment installation
  • Site furnishings (basketball hoop, drinking fountain, etc)
  • Electrical and lighting
  • Chain link fence
  • Athletic court surfacing and striping (Nova Sports certified installer)

Bid documents, including addenda, can be downloaded from the ebidboard website:

https://www.ebidboard.com/public/projects/showproject.asp?mbrguid={C2E26915-BFAE-4A28-B6A9-C250DB666292}&projectguid={B5E69805-EA8B-4D8D-B59F-04BF3F8307DC}

Engineer's Estimate:

$575,000

Contract Duration

90 WDs

Liquidated Damages

$1000 per day

 

Here is a list of bid items on the project:

Mobilization/Temp. Facilities

1

LS

Temporary Tree Protection

1

LS

Layout and Staking

1

LS

Trucking and Off-haul

80

TON

Demolition + Site Clearing

1

LS

Shotcrete

325

SF

Metal Railing and Handrail

135

LF

Anti-Graffiti Coating

1

LS

Install Play Equipment

1

LS

Install Site Furnishings

1

LS

Fabricate and Install Signage

1

LS

Install Drinking Fountain and Utility Connections

1

LS

Install Electrical Fixtures

1

LS

Earthwork and Grading

1

LS

Erosion Control

1

LS

Aggregate Base at Playground

1

LS

Asphalt Paving SF

1775

SF

Concrete Paving

500

SF

Unit Paving

850

SF

Coordinate Playground Protective Surfacing

1

LS

Athletic Court Surfacing

1

LS

Chain Link Fencing

250

LF

Concrete Entry Wall

1

LS

Concrete Perimeter Wall

66

LF

Concrete Planter Wall

58

LF

Curb Divide

35

LF

Court Planter Wall

90

LF

Irrigation work

1

LS

Planting

1

LS

Storm Drain Facilities

1

LS

Tags:

Redwood Engineering & Construction will be bidding on the SF Golden Gate Heights Playground & Field Renovation Project in San Francisco as a prime contractor and invites certified LBEs and others to submit a subcontractor quote.  The project bids on 03/04/2020.  Please direct proposals to This email address is being protected from spambots. You need JavaScript enabled to view it..

Potential subcontractor scopes include, but aren’t limited, to the following:

  • Survey
  • Synthetic Turf
  • Playground Equipment Installer
  • Certified Playground Safety Inspector
  • Trucking
  • Concrete
  • Metalwork / railing

The engineer's estimate is $1,286,000 with a contract duration of 245 calendar days and $2500 per day liquidated damages.  Plans and specifications can be downloaded from San Francisco's website: