Traffic Control Plans and Detour Plans

Traffic Control Plans (TCP) and/or Detour Plans are reviewed and managed by the Right of Way Management Section and are required for all construction work within the road right of way which modifies vehicular, bicycle and/or pedestrian traffic patterns and are necessary to ensure the safe and efficient movement of traffic through construction work zones. TCP templates developed in conformance to the current California Manual of Traffic Control Devices (Cal MUTCD) are available for use and satisfy many of the situations typically encountered.  Those choosing to use these templates should become familiar with all general conditions indicated with the template package and should also note that the templates cannot be used in all locations/situations.  TCP situations not covered by these templates will require review and approval prior to proceeding with construction activities.

Visit the Right of Way Management web page for more information on other section activities.

Additional Information​​

Call 311 or 875-4311 or report online at https://311.saccounty.gov​.